The short answer

Most disagreements on a PCB order are not about capability. They are about two people using the same word for different things, and neither noticing until the boards arrive.

A designer says "0.3 mm hole" and means the drill. A buyer reads the quotation, sees 0.3 mm, and expects a 0.3 mm hole in the finished board. Both are right in their own vocabulary, and the finished hole is 0.25 mm. Nothing was misquoted and nobody lied; the two parties were describing different objects with one number.

Twelve terms carry that risk. Three of them cost real money.

The twelve, and where the gap sits

Read the last column as the filter. Where it says no, the gap costs a conversation. Where it says yes, the gap costs a re-quote, a re-spin or a rejected lot.

The twelve, and where the gap sits
TermDesigner meansBuyer hearsChanges price?
PCBBare board, no partsFinished productYes
PWBOlder name, same objectA different productNo
PadCopper you solder toA holeYes
ViaPlated hole between layersAny small holeYes
Annular ringCopper width around the holePad diameterYes
Drill sizeTool diameterFinished holeYes
Copper weightOunces per square footThickness in mmYes
Solder maskPermanent board coatingSolder pasteNo
SilkscreenPrinted legendAny printed layerSometimes
TgSoftening point, reversibleMax operating temperatureYes
TdDecomposition pointSame as TgYes
PanelThe manufacturing panelOne boardYes

The three that cost the most

Finished hole versus drill size

Every plated hole gets copper in it. A 0.30 mm drill becomes roughly a 0.25 mm finished hole after plating, and the exact reduction depends on the plating thickness the class requires. If your component lead needs 0.28 mm of clearance, a 0.30 mm drill does not give it.

Write both numbers on the fabrication drawing: drill size and finished hole size. A fabricator who receives only one of them will assume the other, and the assumption that protects their process is not always the one that protects your assembly.

Copper weight versus copper thickness

Copper is specified in ounces per square foot, a unit from an era when foil was sold by weight. One ounce is about 35 µm. The conversion is not linear in practice above 2 oz because plating adds to the base foil, so a "2 oz" board may have 70 µm of copper on an outer layer, part foil and part plating.

If a design needs 100 µm of copper for current-carrying capacity, specify the requirement, not the ounce figure, and let the fabricator confirm the build. The difference between 2 oz and 3 oz is a step change in etch capability and in price.

Tg versus Td

Tg is the temperature where the resin softens. It is reversible — cool the board and the property returns. Td is where the resin chemically decomposes. It is not reversible, and it is a different number.

A high-Tg laminate is not automatically a high-Td laminate, and the failure people worry about at reflow is closer to the second than the first. This is the subject of the FR-4 versus high-Tg comparison, and it is the single most common place where a specification sounds rigorous and is not.

Two terms people use to mean the opposite

"Pad" and "hole" get swapped constantly in assembly drawings, which matters because a pad with a hole in the wrong place is a drill error rather than a routing error, and drill errors are caught later.

"Solder mask" and "solder paste" get swapped in conversations with contract manufacturers, which is worse, because one is a permanent board coating and the other is a temporary printing step. A drawing that annotates "mask" over a component pad has stated the opposite of what the designer wanted.

A purchase order line, read twice

Here is a line that appears, in some form, on a large share of orders:

"4-layer FR-4, 1.6 mm, 1 oz, HASL, 0.3 mm holes, 100 pcs."

Read by a designer, that is a complete instruction. Read by a fabricator, it is six questions. One ounce on which layers — all four, or outer only? Holes 0.3 mm drill or finished? Minimum annular ring implied by 0.3 mm holes on a 0.6 mm pad, or pads sized to the ring? HASL leaded or lead-free? "100 pcs" boards or panels? And 1.6 mm finished thickness, or nominal laminate thickness that finishes at 1.55 mm after plating?

None of those questions is pedantic. Each one has two plausible answers with a different price, and the factory will choose the answer that protects its process if nobody chooses for it. Six small decisions, made by someone who has never seen the product.

The fix is not a longer purchase order. It is a stackup drawing that states layer-by-layer copper, a drill table that states finished sizes, a note that names the finish exactly, and a quantity line that says boards and panels separately. Four documents instead of one sentence, and the questions disappear.

If a term appears in both your drawing and your purchase order and the two documents do not say the same thing, the factory will follow the drawing, because the drawing is what the machine reads.

A one-page check before you send the file

None of these take long to write and all of them remove a round of questions.

  • Holes: drill size and finished size both stated, or a note that the drawing uses finished size throughout
  • Copper: weight stated with the layers it applies to, not implied for the whole board
  • Laminate: Tg and Td stated separately, with the grade name and the manufacturer if it is qualified
  • Mask: opening relative to pad stated as a rule, not as a single dimension
  • Quantity: boards and panels distinguished, with the panelisation drawing attached

What we can and cannot do

We will read your drawing in the vocabulary it uses and ask when a number is ambiguous, which is the useful part of a DFM review — the checks in the Gerber review list exist because most ambiguity becomes visible only when the files are opened.

What we cannot do is guess which of two meanings you intended. If the drawing says 0.3 mm and the assembly needs 0.28 mm of clearance, only you know which constraint is real. For the wider vocabulary, the working definition of a PCB covers the object itself, and the file package that removes most of these ambiguities is listed in the file checklist.

CONTINUE YOUR REVIEW

Related manufacturing resources

Explore

PCB Basics

A starting point for engineers and buyers new to printed circuit boards: what the board is made of, how it is built, which terms matter and which specifications a quotation depends on.

YOUR NEXT PCB PROJECT

Let’s define your next build.

Start with your files, requirements and target date.

Prepare a PCB inquiry